Before installation, the system needs to be dimensioned and planned for:
- Location of EnergyHub
- Connection of EnergyHub to DC electrical panel
- Location of current transformers to measure the property's import / export and consumption
- Connection to the Internet
- Location of SSO:s (when installing solar cells)
- Battery location (when installing battery)
- Location of DC Electrical panel (when installing solar cells or batteries)
Even if solar panels and batteries are not installed from the beginning, it can still be good to take height for future expansion so that, for example, space is reserved for batteries or empty pipes are mounted in walls / laid in the ground for future cables.