Can I connect EnergyHub to a 4-wire (TNC) system?

Answer:

Yes, it is possible to connect EnergyHub to a 4-wire system. You will be able to operate the EnergyHub, and phase balancing will work. The EnergyHub itself must be connected with L1, L2, L3, N, PE conductors. However, these can be connected to a distribution board that has a PEN rail. But Ferroamp cannot guarantee that all functions will work as intended, as the system is designed for N and PE to be connected to separate N and PE rails.




We constantly want to improve the content in the Knowledge Database and would appreciate it if you give feedback on our articles. Does all the information exist, is there anything that needs to be clarified or is there any information that is missing that would help installing or using the EnergyHub system in general? You can give us feedback by choosing if the article was helpful or not in the options below. 

If you need to get in contact with Ferroamp's Technical Support or if you have any questions about the system, you can do so by creating a ticket 
here



Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select atleast one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article