Answer:
You set the main fuse size in the system configuration in EnergyCloud. Once you have set the size of your main fuse, the EnergyHub will be able to control your charging station so that charging your electric car does not risk tripping the main fuse.
NOTE! This assumes that your charging station is supported by the EnergyHub system and that control of your charging station through our integration with OCPP 1.6-J is enabled. To activate the integration, contact us here.
See below for an example of how to set your main fuse level in the system configuration in EnergyCloud.
Example:
- Stor the facility by clicking Stop
- Make sure the operating mode is set to Measuring mode.
- Set the main fuse size and click on UPDATE.
NOTE! The ability to set the main fuse size is only available on systems running software version 3.1.0 and later.
We constantly want to improve the content in the Knowledge Database and would appreciate it if you give feedback on our articles. Does all the information exist, is there anything that needs to be clarified or is there any information that is missing that would help installing or using the EnergyHub system in general? You can give us feedback by choosing if the article was helpful or not in the options below.
If you need to get in contact with Ferroamp's Technical Support or if you have any questions about the system, you can do so by creating a ticket here.
Was this article helpful?
That’s Great!
Thank you for your feedback
Sorry! We couldn't be helpful
Thank you for your feedback
Feedback sent
We appreciate your effort and will try to fix the article